1 MW Solar Farm Cost: Development and PPA Advisory
Solar Farm Development Consultant, Advisory Only

Call (561) 779-3213 or use the short form below. Randolph Scott Bell is a solar farm development consultant and PPA consultant for solar projects: feasibility, cost drivers and agreement review from a Florida Certified General Contractor (CGC1528750) and LEED AP. Advisory only.

Call (561) 779-3213 Send the Short Form
B.S. Engineering, Aalborg University MBA University of Miami CGC1528750 Florida Certified General Contractor LEED AP Credentialed

What a solar farm development consultant does

A solar farm development consultant works on the owner's side of the table before anything is built. That means testing the site and the size, preparing the development package and drawings, laying out the agreement the power will be sold under, and reading the bids that come back. Randolph Scott Bell does this as an adviser, not as the builder or the engineer of record.

The useful moment is at the start. A layout fixed before the interconnection and foundation questions are answered, or a contract signed before its obligations are read, costs far more to change later.

1 MW solar farm cost: what moves the number

No price is published on this page, and none should be quoted without a look at the site. What can be said honestly is what drives the figure for a small ground-mounted solar farm of about 1 MW: the condition and bearing of the ground and the foundation or ballast system it needs; the racking and steel; the inverters and any batteries; the distance and terms of the connection to the grid; permitting and inspection; and the financing structure behind the project.

In South Florida the list is shaped by wind-load requirements, salt and humidity, drainage and flood exposure at the parcel, and the permit office that has jurisdiction. A feasibility memo goes through each of those for your parcel and tells you which ones are likely to move the cost, so the figure you carry is built from your own conditions rather than a national average.

PPA and PPP advisory: reading the agreement before you sign

A power purchase agreement fixes who buys the power, for how long and on what terms. A public-private partnership fixes who carries which obligations between a public body and a private developer. Both are easy to sign and hard to unwind. A PPA consultant for solar projects makes the terms, risks and obligations readable in plain language so the owner knows what is being agreed. Drafting and legal review stay with your attorney.

This is work Randolph has done before. He prepared PPP agreements and drawings for solar farm proposals and submitted them to power-plant owners and operators, and he worked that programme for years. Those were bids and development work, not built plants, and no client, plant or result is named here.

The same person holds the credentials that test a solar plan

Randolph holds a B.S. in Engineering from Aalborg University and an MBA from the University of Miami. He is a Florida Certified General Contractor (CGC1528750), a LEED Accredited Professional and a RESNET Certified HERS Rater (RTIN 4516301). His earlier career in Denmark was in energy: waste-to-energy and biomass boiler plants, heat-pump and ventilation product development and insulation equipment.

For the owner, the practical result is that a solar development plan is read by someone who knows what a permit set, an inspection and a change order look like. See also owner's representative services, LEED consulting and HERS rating in Florida.

A plain engagement outline
  1. Scoping call. The site, the size, the owner's goal and the stage the project is at.
  2. Feasibility memo. A written view of cost drivers, risks and the decisions needed now.
  3. PPA or PPP and bid support. Optional support reading the agreement, the drawings and the bids on the owner's side.

Engagements are scoped to the project, advisory only. No price is published and no outcome is promised in advance.

This site has received CSS Design Awards Special Kudos 2026 and Web Design Awards Winner 2026.

Related advisory: Consulting hub · Owner's representative and permit expediting · CHP cogeneration feasibility · Geothermal heat sink consulting · Biomass power plant feasibility.

Tell Us About the Project

Name, phone and a line about the project. That is all we need.

Prefer to talk now? Call (561) 779-3213

Solar Farm Advisory Questions, Answered
What does a solar farm development consultant do?

A solar farm development consultant works for the owner before construction: testing whether a site and a size make sense, preparing the development package and drawings, structuring the power purchase or public-private partnership agreement, and reading bids from the owner's side. The work is advisory. It does not replace the engineer of record or the contractor.

How much does a 1 MW solar farm cost?

No price is published here, because the real number depends on the site, the interconnection, the racking and foundation design, the equipment and the agreement it is financed under. A feasibility memo sets out those cost drivers for your site so the figure you carry is built from your own conditions. Call (561) 779-3213 to talk it through.

What is a PPA consultant for solar?

A PPA consultant helps an owner or developer understand and structure a power purchase agreement, the contract under which a buyer takes the power a solar plant produces. The adviser's job is to make the terms, risks and obligations readable before anything is signed. Legal drafting stays with your attorney.

What is a PPP agreement in a solar project?

A PPP is a public-private partnership: an agreement between a public body and a private party to develop a project. Randolph Scott Bell has prepared PPP agreements for solar farm proposals and submitted them to power-plant owners and operators. Those were bids and development work, not plants he built.

Have you built solar farms?

No. The offer is consulting, owner's-representative, feasibility and PPP and EPC advisory. His solar background is development and bid preparation, including drawings, over a programme of several years. He does not claim to have built a solar farm.

Why would a licensed contractor advise on solar development?

Because a solar plan still has to be permitted, sequenced, inspected and paid for. A Florida Certified General Contractor (CGC1528750) who is also a LEED Accredited Professional can test a development plan against how the work is actually built, so the owner does not carry a cost or schedule risk nobody priced.

Who should call a solar farm development consultant?

Landowners, developers, associations and businesses that are weighing on-site or ground-mounted solar and want an independent view of feasibility, agreement structure and cost drivers before committing money. It is most useful early, before the layout and the contract are fixed.

Do you work in Palm Beach County?

Yes. The base is Loxahatchee in Palm Beach County and the Florida contractor certification is a state certification. Call to discuss the location and type of your project.