Consulting is advisory work: no crews, no installs, only judgement from someone with the licence and the energy credentials. This week the questions are about permits and equipment: which building office reviews a job, and what that does to a biomass, equipment, LEED or reserve-study plan. Each answer points at the page that covers it properly.
Where does a Royal Palm Beach biomass project start?
The village is chartered, has its own Building Division at Village Hall on Royal Palm Beach Boulevard, and sits entirely in the Wind-Borne Debris Region. A plant that burns fuel also needs a state air-quality approval on top of the Village permit.
Who reviews a construction dispute in West Palm Beach?
The City's Development Services Department, Building Division runs permits on its EPL platform, but some West Palm Beach mailing addresses sit in unincorporated county and go to the Palm Beach County Building Division. The expert-witness page starts with that permit record.
What should a Jupiter homeowner ask before choosing a heat pump?
Jupiter is an incorporated town with its own Building Department and an online portal for plan review and inspections, so type and siting are decided with the Town's permit in mind.
What does an owner's engineer do on an equipment purchase?
Industrial equipment procurement is the buying side of a project: specifications, bid levelling and supplier vetting, done on the owner's side of the contract. The hub lists the three towns it covers.
What changes for equipment purchases in Jupiter?
The Building Department is at 210 Military Trail with an online CDS portal, the whole town is in the Wind-Borne Debris Region, and riverfront and oceanfront parcels can fall under Coastal Construction Control Line provisions.
Which Lake Worth office permits the equipment?
The City of Lake Worth Beach runs its own Building Division at 1900 2nd Avenue North, while the unincorporated area west of the city, also called Lake Worth, goes through the Palm Beach County Building Division. Which one applies is the first question on any equipment package.
How does Wellington's permit office affect an equipment order?
Wellington is an incorporated village with its own Building Division at the Wellington Municipal Complex on Forest Hill Boulevard, not the county, so the installation permit goes there.
What does a LEED consultant do for a Jupiter project?
The page covers credit strategy against the Town's Building Department at 210 Military Trail and against coastal provisions along the Loxahatchee River. It is advisory only.
What does a LEED consultant do for a Wellington project?
Wellington permits through its own Building Division on Forest Hill Boulevard, and the page ties the credit plan to that submittal. It is advisory only.
Does a Loxahatchee condo board need a reserve study?
Florida's reserve study requirement is written for condominium and cooperative buildings of three stories or more, and Loxahatchee is mostly single-family houses on acre-plus lots. The page explains who is covered and whose permit office applies.
Who permits owner's-representative work in Greenacres?
Greenacres is an incorporated city. Its Development & Neighborhood Services Building Division at City Hall on Melaleuca Lane reviews plans, issues permits and schedules inspections through an ePermit portal.
Also new on the Consulting hub
Two more pages went up: LEED consultant in Royal Palm Beach and solar farm development and PPA advisory, which explains what drives the cost of a 1 MW solar farm without quoting a price.
Also on the Consulting hub
The Consulting hub lists every engagement. Everything on it is advisory, and all of it rests on a Florida Certified General Contractor license (CGC1528750), a RESNET Certified HERS Rater credential (RTIN 4516301), a LEED Accredited Professional credential and an MBA.