Call (561) 779-3213 for an independent read on your City permit, bid and schedule, from a Florida state-certified General Contractor (CGC1528750) who is also a B.S. engineer. Advisory only.
Site design awards: CSS Design Awards Special Kudos 2026 · Web Design Awards Winner 2026
West Palm Beach is the county seat, and it permits for itself. The City's Development Services Department, Building Division, takes applications, plan review and inspection scheduling through its EPL platform and the Civic Access portal. That is a different office and a different submittal habit from the Palm Beach County Building Division, which covers unincorporated areas. An owner who hires for a West Palm Beach build and assumes the county process applies is the owner whose file waits on a comment nobody answered.
Permit expediting is offered in Florida and in Palm Beach County. In West Palm Beach it means a complete package filed with the City, review comments read in plain language, and inspections checked against the schedule. The advisory role stays separate from construction: what is found is yours to take to any licensed contractor, or to Bell Engineering & Construction for a bid, with no obligation either way.
Randolph Scott Bell holds CGC1528750, a Florida state-certified General Contractor license, and has been through the Florida contractor licensing process six times. He also holds a B.S. in Engineering from Aalborg University in Denmark, an MBA from the University of Miami, and is a LEED Accredited Professional, a RESNET Certified HERS Rater (RTIN 4516301) and an Energy Star v3 Verifier. Where a West Palm Beach project turns on HVAC, envelope or energy performance, the review comes from someone who reads both the engineering and the paperwork.
See the full service on the permit expediting and owner's representative page, and the same service in Jupiter and Delray Beach.
Once the permit path is clear, an owner usually needs the build itself: construction in West Palm Beach covers who holds the City permit and carries the job. A roof is often the first thing a review flags, so see roofing in West Palm Beach. If the property sits inside an association, property management in West Palm Beach is where the board side lives, and for lot clearing ahead of a build, land services in West Palm Beach handles the site work.
The City of West Palm Beach runs its own Development Services Department, Building Division. Applications, plan review and inspection scheduling go through the City's EPL platform and its Civic Access portal. West Palm Beach is incorporated, so it is not the Palm Beach County Building Division that covers unincorporated areas. Confirming the office for your exact address is the first step of any permit job.
The owner's representative works for the property owner, not the contractor. In West Palm Beach that means checking that the City permit is complete and moving, reading bids for what is left out, tracking change orders and checking that inspections are being called. The advisory role is kept separate from construction.
Permit expediting is offered in Florida and in Palm Beach County. It covers preparing the package, filing it with the City, following plan review and helping answer comments. What is prepared and what is pulled under license is settled when the project is scoped.
For exterior changes, yes. El Cid, Flamingo Park, Old Northwood and Southland Park are City of West Palm Beach historic districts, and the Historic Preservation Board must approve exterior changes such as a new opening or a roofline change before the permit is finaled. Interior-only work generally does not trigger that review. A property inside a private HOA has a separate approval of its own.
The coastal core, downtown and the neighborhoods along the Intracoastal, falls in the 170 mph design wind band under the Florida Building Code 8th edition and ASCE 7-22. Every new or resized exterior opening needs a Florida Product Approved unit rated to that standard. These are read against your parcel before a bid or schedule is trusted.
Yes. Many engagements start after a contractor is chosen. The review covers the signed contract, the bid, the change orders, the permit status and the inspection history without replacing your contract.
It is scoped to the project, so call (561) 779-3213 to talk through what your project needs. No price is quoted until the scope is understood.
No. The advisory findings belong to the client, who can take them to Bell Engineering & Construction for a bid or to any other licensed contractor, with no obligation either way.